hi all in the process of hacking up my old garage concrete floor and buried in the concrete is or was a length of water pipe lead or steel and a stop cock when I removed the concrete it sheared the pipe and pressurised water came out
as I temp I just flattened the pipe to stop the flow now what do I do I need to dig deeper to blank it off its 300mm inside our property and 1000mm from what we thought was the only stop cock the water boards stop cock for our property 1000mm outside our property
also would it be easier or safer to renew the main feed to the house as it will be concreted under the need garage floor