Hi after some urgent advice please to enable me to progress with bathroom renovation. I have installed 12mm no more ply boards on an external wall in shower area. I have used concrete screws and also dot and dabbed the boards with gyproc dri-wall adhesive. I applied sbr to the wall but forgot to sbr the board. 24-36 hours later I have dab spots showing through. What are my options now?
Should I sbr the front of the board now to migitate the transfer and hope it dries out?
I don’t want to remove the boards as I have already installed my shower tray and I don’t think the boards are going to budge!
Help
Thanks
Should I sbr the front of the board now to migitate the transfer and hope it dries out?
I don’t want to remove the boards as I have already installed my shower tray and I don’t think the boards are going to budge!
Help
Thanks