Hi all,

Just doing my research. At some point a 4M RSJ (two of them probably one per leaf) will be installed and a bi-fold put in. I'm wondering how the external brick damage and RSJ at the top is best hidden or dealt with.

I'm used to PVC windows being rebated a little is this the same with bifolds or do they install flush? Flush would make it easier to apply trim.

There will be two cuts from existing windows to the ground, so ~1M x 2 of cut bricks.

Trim?

Something like large aluminium sheet at the top the same colour as the doors going all the way across and then some 30mm sort of trip going around the sides?

Reclaim Bricks?


Mine are impossible to buy new but I'd have enough from the removal that I could carefully reclaim, clean and reuse. In my experience the mortar will not be an exact match though. Obviously this is not normal practice as it'll take forever, but it's my house and I'm staying so if it's a cleaner option I'd look at it. I already did this for opening a garage last year.

Or maybe do this for the sides and then the RSJ gets covered as bricks would need making into slips if they were to go into two RSJ's which sounds impractical.

Something else?

Tell me what I don't know!

Cheers!

Andrew
 
The outer RSJ should really have an 80mm plate welded to it with webs to take a soldier course, obviously with a cavity tray.

I have never met an installer fit the vertical DPC correctly when fitting windows and doors in the outer leaf. The DPC should be in the cavity around fully around the reveal. Then fit the door/window. Silicone seal the frame to the DPC, then trim the excess DPC off. Any moisture/water between the brick and DPC just runs down the cavity. Obviously the DPC will be penetrated with concrete screws, unless the install allows cleats.
 
When you say outer RSJ isn't there just one RSJ with this approach (concrete and brick leafs, 65mm cavity)?

I've only done RSJ install once using two separate RSJ's of similar length (4M). I'm aware that a single RSJ is likely a lot more difficult to manhandle at this size, plus there'll be thermal bridging to contend with.

Regarding the soldier course I'd have to reclaim bricks which would be time consuming and unlike to match (mortar colour) the existing. I doubt installers do this as it'll be very time consuming.
 
If the outer skin is brickwork you wouldn't use two separate steel beams because you can't hide the outer one, that's why you'd use a single beam with a plate to support the outer skin. Or just a conventional lintel.

Well technically you can hide it but only by sticking something to the front which will look a bit crap.
 
Yeah that was one of my questions as well, whether there was some large trim to hide the top. I couldn't see how the dual RSJ would work otherwise.

I should explain my gap is roughly 1.8M of window (with soldiers), 1.2M of wall in the middle to be knocked out, and 0.8M of window (with soldiers).

The existing soldiers will be resting on metal lintels which span both leafs (as I've seen them before when doing other work).

So is it a case of trying to save/reclaim bricks? The bricks can't be matched, I tried that before but they're from the 80's and long gone.

Or something else?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top