I was looking at some Wickes floor tiles and it states they need to be bedded
in on a flat bed.
I need to raise my floor up a bit - so a 10mm deep bed of powdered adhesive mix
would be handy, but how do you apply a deep bed?
Normally you'd use a notched trowel to get the right depth, but I cannot see how you
can trowel in consistently at the right depth (or do you have to keep adjusting with level)?
Any help appreciated.
Thanks. Stephen