I am building my exentions and have built the 2 corners up.
the extension is 14m long and 2m deep. Currently each end is 5m long with a 2m return strapped to the existing house. There is a 4m gap beteen the 2 corners waiting for the lintel for the bifold doors.
Question is, I can physically sway the walls where they are at the open end. I guess once the lintel is on and once the weight of the roof is on, this would stabilise the wall however should i have a return nib if so what is the maximum distance. there are a could of locations i could build these where i had intended to build light weight partitions.
the extension is 14m long and 2m deep. Currently each end is 5m long with a 2m return strapped to the existing house. There is a 4m gap beteen the 2 corners waiting for the lintel for the bifold doors.
Question is, I can physically sway the walls where they are at the open end. I guess once the lintel is on and once the weight of the roof is on, this would stabilise the wall however should i have a return nib if so what is the maximum distance. there are a could of locations i could build these where i had intended to build light weight partitions.