How long to leave mortar repairs to dry before covering with filler?

Joined
8 Sep 2010
Messages
985
Reaction score
23
Location
South West Wales
Country
United Kingdom
Afternoon folks

I've been doing some filling around the house. Some of it was quite deep, so I've used mortar for the bulk of it and will finish with filler on top. How long should I wait for the mortar to dry before using the filler?

Cheers
 
Sponsored Links
Till it looks dry, indoors with heating on it shouldn't take long at all. It'll go a light colour when it's dried.
 
Thank you. It looks to have dried pretty well and is certainly lighter in colour, but to be on the safe side I'll put the filler down and wait a little longer. Wouldn't want to have to do it all again and there's plenty of other jobs to crack on with!

Cheers
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top