got to patch up a small bit of plaster behind the dishwasher, so I thought I'd give it a go myself as it's never going to be seen
I'll chop out the whole thing to the underside of the counter as it's about 1 1/2 inches thick one side and about 1/2 inch the other..
the problem is that the pipes run across about 12 inches from the floor to the bathroom so I'll need to slide the board behind the pipes..
how do you manage that with the dot 'n' dab? ( no counter tops on so height not an issue for sliding down.. )
drill small holes and use a mortar gun to squeeze it in behind?
I'll chop out the whole thing to the underside of the counter as it's about 1 1/2 inches thick one side and about 1/2 inch the other..
the problem is that the pipes run across about 12 inches from the floor to the bathroom so I'll need to slide the board behind the pipes..
how do you manage that with the dot 'n' dab? ( no counter tops on so height not an issue for sliding down.. )
drill small holes and use a mortar gun to squeeze it in behind?

