- Joined
- 11 Jul 2007
- Messages
- 440
- Reaction score
- 3
- Country
Our house has suspended concrete floors and the kitchen has a good build up of tiles, about 4 layers.
We wish to take the floor back to the concrete so we can underfloor heat and have it the same level as other rooms, as we've taken a wall down.
Someone has mentioned a scrabbler but says it's a big job that gets messy.
Any advice?
We wish to take the floor back to the concrete so we can underfloor heat and have it the same level as other rooms, as we've taken a wall down.
Someone has mentioned a scrabbler but says it's a big job that gets messy.
Any advice?