Hello all,
Apologies for my complete ignorance on this topic.
I have a bathroom that is stripped with work ready to be started on it. I can do all of the tiling myself - BUT, I don't know at what point in the 'project' that the shower needs to be installed.
Previously there had been a gravity fed shower, and this is being replaced with a power shower.
My plan was to tile the floor, install the shower tray, then toilet/sink/towel rail in place of radiator.....
I then have no idea as to whether the power shower needs fitting and wiring before tiling, or whether I can tile first?
Any advice welcomed.
Apologies for my complete ignorance on this topic.
I have a bathroom that is stripped with work ready to be started on it. I can do all of the tiling myself - BUT, I don't know at what point in the 'project' that the shower needs to be installed.
Previously there had been a gravity fed shower, and this is being replaced with a power shower.
My plan was to tile the floor, install the shower tray, then toilet/sink/towel rail in place of radiator.....
I then have no idea as to whether the power shower needs fitting and wiring before tiling, or whether I can tile first?
Any advice welcomed.