Hi
I wonder if anybody could give me some advice and tips on the method of installation of a replacement RSJ and padstones.
I live in a victorian house with a traditional layout with the kitchen at the back of the house. It was extended to the side around 10 years ago using RSJ's spanning between the end walls and a pillar in the middle.
My plans are to replace the 2 span arrangement with a single span by removing the central pillar and replacing the 2 smaller RSJ's with a larger one. I have the design calculations for the new beam and padstones but i would like some tips on how to install them. The new beam has a larger section than the existing and as it carries more load the padstones need to be larger. I have looked at using ACRO props with Strongboy attachments to carry the existing wall when i move the beams but when i install the padstone the mortar should be left to cure for 28 days and i dont really want the expense of hiring the equipment for such a long time. Does anybody know if there is a way to get around this problem? Also, should the new RSJ be bolted to the padstone to prevent lateral movement? Does anybody know of the best lifting equipment to get the RSJ into position - it weighs over 250kg's - i have looked at using 2 Genie lifts?
Thanks
I wonder if anybody could give me some advice and tips on the method of installation of a replacement RSJ and padstones.
I live in a victorian house with a traditional layout with the kitchen at the back of the house. It was extended to the side around 10 years ago using RSJ's spanning between the end walls and a pillar in the middle.
My plans are to replace the 2 span arrangement with a single span by removing the central pillar and replacing the 2 smaller RSJ's with a larger one. I have the design calculations for the new beam and padstones but i would like some tips on how to install them. The new beam has a larger section than the existing and as it carries more load the padstones need to be larger. I have looked at using ACRO props with Strongboy attachments to carry the existing wall when i move the beams but when i install the padstone the mortar should be left to cure for 28 days and i dont really want the expense of hiring the equipment for such a long time. Does anybody know if there is a way to get around this problem? Also, should the new RSJ be bolted to the padstone to prevent lateral movement? Does anybody know of the best lifting equipment to get the RSJ into position - it weighs over 250kg's - i have looked at using 2 Genie lifts?
Thanks