Hello all, I am installing a resin drive but it seems to be too high already with the permeable cement. The slope is going down and is fitted with a drain but i am concerned we may be too close to DPC level. The resin will be added on this permeable cement next month which is 1.5-2cm thick.
The people doing the resin drive said there is nothing to worry and the resin and permeable cement are both pourous but i am worried that as we close to DPC there could be raising damp problems. Also the say we have a drain flowing down.
Pls help. Attached some pics for you to see
The people doing the resin drive said there is nothing to worry and the resin and permeable cement are both pourous but i am worried that as we close to DPC there could be raising damp problems. Also the say we have a drain flowing down.
Pls help. Attached some pics for you to see