This is 'accessible' by lifting the boards on our 3rd floor loft conversion.
The house was student letting until we purchased earlier this year it has a current electrical safety certificate, next inspection due 2016.
All the cables are in use suppling the 2nd floor lights/switches and continuing on to the loft itself.
I'm just a bit shocked to find such an untidy mess, a couple of the junction boxes have over 2mts of cable connecting them scrunched up to fit under the floor where they sit sandwiched between polystyrene block insulation.
What's best, tidy it up/shorten unnecessary cable or redo the 2nd floor lights using ceiling rose instead of the junction boxes.
'Afraid to say it's got to be diy but shall be having a (different) sparks in to check everything out and do the main work.
You opinion is much valued
The house was student letting until we purchased earlier this year it has a current electrical safety certificate, next inspection due 2016.
All the cables are in use suppling the 2nd floor lights/switches and continuing on to the loft itself.
I'm just a bit shocked to find such an untidy mess, a couple of the junction boxes have over 2mts of cable connecting them scrunched up to fit under the floor where they sit sandwiched between polystyrene block insulation.
What's best, tidy it up/shorten unnecessary cable or redo the 2nd floor lights using ceiling rose instead of the junction boxes.
'Afraid to say it's got to be diy but shall be having a (different) sparks in to check everything out and do the main work.
You opinion is much valued
