B
BuildingNovice
I'll be grateful for some guidance on this.
I have specified 10 extra light fittings (ceiling spotlights) over and above original spec, and my builder wants to charge £50 for each light.
Is that reasonable in terms of the work required? The electrician will obviously be running a circuit cable anyway, so is the extra work mainly just fitting the actual spotlights?
I have specified 10 extra light fittings (ceiling spotlights) over and above original spec, and my builder wants to charge £50 for each light.
Is that reasonable in terms of the work required? The electrician will obviously be running a circuit cable anyway, so is the extra work mainly just fitting the actual spotlights?