I have been asked to instal scaffold boards as shelves, but with one twist. They want two boards joined to make shelves of variants up to 440mm. The customer/mate will have the brackets fabricated for each run of shelves.
I've never done this before and I am concerned that the boards will cup or twist over time?
I could do a proper quote with a disclaimer on it I suppose.
Has anybody tried this or have advice on this idea please?
I've never done this before and I am concerned that the boards will cup or twist over time?
I could do a proper quote with a disclaimer on it I suppose.
Has anybody tried this or have advice on this idea please?

