Hi,
Just completed on a house and am trying to work out the CH/DHW. The property was a Repo and has had the gas meter removed and water drained (property empty since december). Have switched mains water back on and tank in the loft has filled fine noticed lack of F&E tank in the loft for the Baxi Bermuda back boiler. Also most of the radiators in house are fed from one end rather than either end (see atached photo) via small bore pipe have located one manifold on gnd floor and possible sighted one on 1st floor. Will be changing the boiler out in the future (lack of funds to build proposed extn where the new boiler will be) so would like to get this one up and running to get through the coming winter. I have attached various photos of what I believe are releavant areas of the system. I can see 4 pipes going towards the back boiler through the chimney breast, flow and return towards cylinder and I also think another 2 pipes going towards manifold on the 1st floor but cant quite see up the box section going towards 1st floor. Also can see a union that may be the filling point that is also in the picture called all pipe work next to breast. Really surprised not to see a F&E tank in the loft so not sure how you go about filling the system. Cylinder does have an vent as does the flow pipe towards the cylinder. Any help very much appreciated.
Just completed on a house and am trying to work out the CH/DHW. The property was a Repo and has had the gas meter removed and water drained (property empty since december). Have switched mains water back on and tank in the loft has filled fine noticed lack of F&E tank in the loft for the Baxi Bermuda back boiler. Also most of the radiators in house are fed from one end rather than either end (see atached photo) via small bore pipe have located one manifold on gnd floor and possible sighted one on 1st floor. Will be changing the boiler out in the future (lack of funds to build proposed extn where the new boiler will be) so would like to get this one up and running to get through the coming winter. I have attached various photos of what I believe are releavant areas of the system. I can see 4 pipes going towards the back boiler through the chimney breast, flow and return towards cylinder and I also think another 2 pipes going towards manifold on the 1st floor but cant quite see up the box section going towards 1st floor. Also can see a union that may be the filling point that is also in the picture called all pipe work next to breast. Really surprised not to see a F&E tank in the loft so not sure how you go about filling the system. Cylinder does have an vent as does the flow pipe towards the cylinder. Any help very much appreciated.

