- Joined
- 11 Jan 2004
- Messages
- 11
- Reaction score
- 0
- Country
Our bathroom has had a tile floor layed, this has raised the level of both the wc and basin by 1cm. Is there any easy way of extending the taps and the cistern valve to meet the original pipework without cutting the pipes. Thanks