I have existing decking that is 3 bricks from the dpc. The decking is about 10 years old and structurally ok, the depth to the ground is about 100 - 150mm on loose stone gravel. The very occasional weed does grow through.
I want new decking near level to my patio door.
The decking boards will be run opposite to how they are currently run.
Can I lay new decking on top of existing decking or should I remove the existing decking and build higher?
I want new decking near level to my patio door.
The decking boards will be run opposite to how they are currently run.
Can I lay new decking on top of existing decking or should I remove the existing decking and build higher?