Hi,
Just finished tiling the extension roof and am now looking at fitting the lead flashing.
I've got code 4 lead, 300mm wide and need to fit this along the top abutment to the house, and then side sloping (18 degrees) abutment.
From my research, fitting the top abutment looks quite easy, however the side section needs more investigation.
I have fitted a secret gutter under the tiles on the side where it meets the existing house, but now I need to fit the flashing.
- Do I need to fit soakers? is this possible with interlocking tiles which I have ?
- I had planned on having the lead cover some part of the tiles, however as these are stepped, then how is the lead formed over these?
- Or should the lead work simply fit under the tiles allowing water to run into the secret gutter? in which case just fit the flashing as an upstand ?
thanks
Just finished tiling the extension roof and am now looking at fitting the lead flashing.
I've got code 4 lead, 300mm wide and need to fit this along the top abutment to the house, and then side sloping (18 degrees) abutment.
From my research, fitting the top abutment looks quite easy, however the side section needs more investigation.
I have fitted a secret gutter under the tiles on the side where it meets the existing house, but now I need to fit the flashing.
- Do I need to fit soakers? is this possible with interlocking tiles which I have ?
- I had planned on having the lead cover some part of the tiles, however as these are stepped, then how is the lead formed over these?
- Or should the lead work simply fit under the tiles allowing water to run into the secret gutter? in which case just fit the flashing as an upstand ?
thanks