Im currently leading a conservatory roof into an old random stone wall with a thin coat of render.
Its proving to be difficult to get the lead to sit evenly into the stone and morter.
Ive got about 50% fixed into the stone - can you see any problems if i used lead mate to bond the floating sections i cant fix, and then run a 50mm render bead over the entire lead joint to the wall and blend that into the render above. (did that make sense?
)
The roof will be sealed under the lead as a precation.
Any other ideas how to tackle this?
Its proving to be difficult to get the lead to sit evenly into the stone and morter.
Ive got about 50% fixed into the stone - can you see any problems if i used lead mate to bond the floating sections i cant fix, and then run a 50mm render bead over the entire lead joint to the wall and blend that into the render above. (did that make sense?
The roof will be sealed under the lead as a precation.
Any other ideas how to tackle this?