Help please. Just installed a basin mixer with pop up waste but have a small leak where the rod assembly screws in from the side. There is a plastic ball and a plastic washer that the push rod goes through which is then screwed in with a chrome screw cover. Not sure if I have the washer and ball in the correct position, currently have washer then ball then screw cover, is this correct?