Hello again everyone.
Heres a question. I have a shed in my garden (i think that the size is 6'x6') which I need to raise a little and put some 4x2 or 4x4 under (I havent decided how high i want it yet.
The question is, how can i do this on my own? Anyone have any great suggestions? I have tried lifting it but i can hardly shift it. I was thinking of cutting 5 or 6 beams at the correct length and then shove them under once i have lifted it but dont know how. Need the easiest method for doing this other that getting loads of people around to lift it up.
Heres a question. I have a shed in my garden (i think that the size is 6'x6') which I need to raise a little and put some 4x2 or 4x4 under (I havent decided how high i want it yet.
The question is, how can i do this on my own? Anyone have any great suggestions? I have tried lifting it but i can hardly shift it. I was thinking of cutting 5 or 6 beams at the correct length and then shove them under once i have lifted it but dont know how. Need the easiest method for doing this other that getting loads of people around to lift it up.