I am going to flush and then drain down my open vent system to replace a trv and fit a magnaclean.
My problem is that i am a little unsure where to fit it.
The website suggests after the pump or in the return. In order to fit it after the pump i would need to also fit it after the divertor valve which would mean upping the pipe size from 15mm (it goes fromm 22 to 15 just after the y valve and then back to 22 after the lower shutoff valve).
This doe's not seem like a great idea to me as it would be after the junction to the y valve.
Alternatively i could fit it on the inlet side to the pump but i am not sure about this and have arrowed the 2 locations for clarity as a picture paints a thousand words!
Can anyone point me in the right direction as i am having a little trouble working out which pipe to fit it to.
Ignore the state of my airing cupboard and the crappy power adapter which is also coming out!
View media item 8871
My problem is that i am a little unsure where to fit it.
The website suggests after the pump or in the return. In order to fit it after the pump i would need to also fit it after the divertor valve which would mean upping the pipe size from 15mm (it goes fromm 22 to 15 just after the y valve and then back to 22 after the lower shutoff valve).
This doe's not seem like a great idea to me as it would be after the junction to the y valve.
Alternatively i could fit it on the inlet side to the pump but i am not sure about this and have arrowed the 2 locations for clarity as a picture paints a thousand words!
Can anyone point me in the right direction as i am having a little trouble working out which pipe to fit it to.
Ignore the state of my airing cupboard and the crappy power adapter which is also coming out!
View media item 8871
