Hi guys. Since i have never tiled before, i will just mixing enough adhesive to cover 1 square meter at a time which leads to the following questions:
1) Certainly, mixing just that little amount with a paddle and electric drill is a bit impractical....i have experienced it yesterday, when a was mixing small quantities of mortar, basically i ended up with splashes everywhere. Will it be ok to mix it with a trowel and for how long. If you use an electric drill, they say you should mix it for 2-3 minutes then let it rest but they do not say anything when you mix it with a trowel.
2) Do i have to wash the bucket after each mix?
Thank you very much for your time.
1) Certainly, mixing just that little amount with a paddle and electric drill is a bit impractical....i have experienced it yesterday, when a was mixing small quantities of mortar, basically i ended up with splashes everywhere. Will it be ok to mix it with a trowel and for how long. If you use an electric drill, they say you should mix it for 2-3 minutes then let it rest but they do not say anything when you mix it with a trowel.
2) Do i have to wash the bucket after each mix?
Thank you very much for your time.