2 runs of UFH pipe need to be moved or even ideally removed (as they are in what will now be the shower).
The system is up & running.
What is the best way to do this - take the zone up, cut it at the manifold & then relay?
Is it possible to 'empty' just that one zone or does the entire system need draining?
There's no flooring down at the moment so all pipes are visible/accessible
Thanks
The system is up & running.
What is the best way to do this - take the zone up, cut it at the manifold & then relay?
Is it possible to 'empty' just that one zone or does the entire system need draining?
There's no flooring down at the moment so all pipes are visible/accessible