Hi,
I am about to have a forth bedroom added with an ensuite. The house is double fronted. Our boiler is currently in the loft on the one side of the house and the new bedroom will be on the other side of the house to the boiler.
Currently the CH/HW pipes come down directly from the boiler and feed the rads and HW.
Should I add the extra bedroom onto the existing CH circuit? Currently the pipes go from 22mm into 15 mm where there are already 3 rads on the circuit on this side of the house. Do I have to upgrade the pipe work to 22mm right into the new bedroom ( I have heard that you are nly supposed to have 3 rads on a 15mm run of CH pipe) or would it better to run a separate branch straight from the boiler in the loft and drop down into the ensuite/bedroom?
I do plan to get a plumber out to quote for the job so I can ask his view but I have done all my own plumbing in the past and wanted to do this also but just wanted to know what was best practice.
Thanks in advance
I am about to have a forth bedroom added with an ensuite. The house is double fronted. Our boiler is currently in the loft on the one side of the house and the new bedroom will be on the other side of the house to the boiler.
Currently the CH/HW pipes come down directly from the boiler and feed the rads and HW.
Should I add the extra bedroom onto the existing CH circuit? Currently the pipes go from 22mm into 15 mm where there are already 3 rads on the circuit on this side of the house. Do I have to upgrade the pipe work to 22mm right into the new bedroom ( I have heard that you are nly supposed to have 3 rads on a 15mm run of CH pipe) or would it better to run a separate branch straight from the boiler in the loft and drop down into the ensuite/bedroom?
I do plan to get a plumber out to quote for the job so I can ask his view but I have done all my own plumbing in the past and wanted to do this also but just wanted to know what was best practice.
Thanks in advance