Had a quick search, random results......
Long story short, new combi boiler (Biasi 28 HE, 7 trv's, 2x 1600 by 600 double rads, 2x 1200 by 500 double rads, 1x 1400 x 500 single, filling loop, vent pipe and 8 rad valves - £630 - B&Q HeatPack offer)
Existing 15mm gas pipe to bathroom where old boiler was, been told needs to be 22mm all the way from gas meter to boiler - surely this can't be right?! Anyone confirm this please?
Long story short, new combi boiler (Biasi 28 HE, 7 trv's, 2x 1600 by 600 double rads, 2x 1200 by 500 double rads, 1x 1400 x 500 single, filling loop, vent pipe and 8 rad valves - £630 - B&Q HeatPack offer)
Existing 15mm gas pipe to bathroom where old boiler was, been told needs to be 22mm all the way from gas meter to boiler - surely this can't be right?! Anyone confirm this please?