- Joined
- 6 Aug 2016
- Messages
- 2
- Reaction score
- 0
- Country

My 15 yr old vissman vitodends 100 sprung a leek yesterday british gas came to look at it today and found a burst flow pipe from the primary heat exchanger to the main flow bloc / hw heat exchanger this was due to the pipe being blocked up with magnetite the pipe from the pump is also solid. i was basically told its new boiler time as the pump and both Hex could be knackered obviously a new boiler can cost upwards of 2.5k plus a power flush. what are the chances of me getting a few more months out of it while I sort a deal on a new one ? I was looking at getting BG to fix it as its covered under our plan
Thanks
Thanks