Anyone any suggestions. The old dpc appears to be a hot-poured asphalt type dpc which appears to have been laid on top of a layer of mortar, and spans accross the cavity(filled with ballast).
Each time I try lifting a brick carefully to try and preserve a bit of the old dpc, the lot just lifts with the brick. I've gone back along about three bricks so far with the same result.
So I have virtually nothing to overlap with the new dpc.
Anyone's experience/suggestions would be welcome.
I doubt that BCO will be able to see it afterwards, but I'd like to try and get some continuity, if possible.