Hi All
I am getting a new fitted kitchen in a new extension, currently it has studs installed at 400m centres.
All of the units that are being installed will be at worktop level and high level so I would need to install noggins across the whole length to carry these.
This would be two noggins between each stud, is this enough?
Also should I put one in at the top and the bottom to carry the plasterboard (12.5mm)?
I am getting a new fitted kitchen in a new extension, currently it has studs installed at 400m centres.
All of the units that are being installed will be at worktop level and high level so I would need to install noggins across the whole length to carry these.
This would be two noggins between each stud, is this enough?
Also should I put one in at the top and the bottom to carry the plasterboard (12.5mm)?