Forgive me if this is the wrong section to post my query, this is my first post. I was wondering if anyone could help me out.
I've recently had some building work done on my house and it involved laying a new concrete floor in the kitchen (as a result not had a kitchen for 6 weeks). The depth of the concrete was roughly 3.5"/4". I understand that is unadvisable to lay flooring for at least 8 weeks to allow the floor to settle properly. However, does this apply to fitting the kitchen units?
I've recently had some building work done on my house and it involved laying a new concrete floor in the kitchen (as a result not had a kitchen for 6 weeks). The depth of the concrete was roughly 3.5"/4". I understand that is unadvisable to lay flooring for at least 8 weeks to allow the floor to settle properly. However, does this apply to fitting the kitchen units?