Hi
I'm doing a new patio. The old one was pre cast concrete slabs on a sand / gravel mix. The drainage was poor. We've taken up the old slabs.
Now doing the preparation for the new patio. There will be a wall on two side. You can see the start of the two walls in the photo below.
We've had some heavy rain. This is the result....
https://photos.app.goo.gl/Mt9BwUvkg75NTrgP2
I think we should stop now and remove all of the current base and take it back to soil. Removing the sand and sorting the drainage. Presume people here agree ! Also, should we build the 2nd wall now or wait until after the patio is complete ?
I'm doing a new patio. The old one was pre cast concrete slabs on a sand / gravel mix. The drainage was poor. We've taken up the old slabs.
Now doing the preparation for the new patio. There will be a wall on two side. You can see the start of the two walls in the photo below.
We've had some heavy rain. This is the result....
https://photos.app.goo.gl/Mt9BwUvkg75NTrgP2
I think we should stop now and remove all of the current base and take it back to soil. Removing the sand and sorting the drainage. Presume people here agree ! Also, should we build the 2nd wall now or wait until after the patio is complete ?