New rads?

Joined
16 May 2009
Messages
101
Reaction score
0
Location
Gwent
Country
United Kingdom
Hey guys, first of all i was just reading that post about the apprentice, haha made me laugh.

Anyway down to buisness.

My living room has one 600 in the middle of the room. supplied by microbore pipe.

Im hoping to fit two 300's in there instead, can i just connect onto the microbore with some new microbore and run the pipework for the rads?
Will the microbore be enough to fuel the two rads?
 
Sponsored Links
yeah lol,

ok buddy, thanks for the quick reply,

so let me just run through this,

Turn off the heating pipework,

drain rads,

disconnect valves

fix new to wall,

fix clips,

run pipework,

connect to new valves on new rads.

turn heating system back on

bleed system?

sound alright for you,

btw im just finishing off my city and guilds technical certificate, so i feel confident in doing this?
 
Sponsored Links
:)

yep turn off heating

drain system

drain 600 rad

disconnect valves

fit new rads

dress them , run pipes , clip etc

turn heating back on

poss add inhibitor ?

bleed

yep sounds gurd to me :)


yep confidence is the key :p
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top