- Joined
- 24 Jul 2018
- Messages
- 9
- Reaction score
- 0
- Country
Hi all.
I am currently doing my bathroom and have nmp to put in the shower, walls and floor. However I bought all 6mm nmp for the entire project which obviously is not thick enough for the walls. It's quite expensive stuff so I was thinking of doubling up 2x6mm to make 12mm on the shower walls. Of course I would stagger joints and glue and fix with screws. Does anyone think this will be an issue?
Also is it recommended to put a vapour barrier up before fixing the nmp or even mineral insulation in between the studs. I am aware nmp should be glued to studs which I couldn't do if a barrier was installed.
Thanks all
I am currently doing my bathroom and have nmp to put in the shower, walls and floor. However I bought all 6mm nmp for the entire project which obviously is not thick enough for the walls. It's quite expensive stuff so I was thinking of doubling up 2x6mm to make 12mm on the shower walls. Of course I would stagger joints and glue and fix with screws. Does anyone think this will be an issue?
Also is it recommended to put a vapour barrier up before fixing the nmp or even mineral insulation in between the studs. I am aware nmp should be glued to studs which I couldn't do if a barrier was installed.
Thanks all