NYY-J or 'Tuff Sheath'

See post #2 for the best answer :whistle:

So the route in total is this:

Consumer unit behind kitchen cupboards (gland SWA into CU).

Back of kitchen units for 3-4m.

Turn 90 to go through 9" solid brick wall.

Turn 90 downwards towards the ground.

Turn 90 to go horizontal under the gate for 1m.

Turn 90 to come out tye ground and go vertical up the outhouse exterior wall.

Gland into junction box directly behind the consumer unit on the inside of the outhouse.

Take the cores through to consumer unit.

It's a lot of bends in a short distance which is what I'm worried about with SWA.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top