Patchy Wall

Joined
17 Aug 2007
Messages
42
Reaction score
1
Location
Kent
Country
United Kingdom
I am in the process of doing up my bathroom and removed the old tiles from the wall.

This was fine although some of the plaster has come off and I now have large areas without any plaster at all. The remaining plaster was quite damp to start with but has now dried out.

I was wondering whether I would need to carry out any extra preparation before continuing to tile or should I remove all of the old plaster and tile directly onto the plasterboard?

Thanks in advance.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top