Well folks, it's that time again!
This week we have an old cooker supply.
It is 2no. 6.0mm² singles fed in steel conduit, relying on the conduit for earth.
The cooker supply is no longer used, and has had most of the kitchen ring circuit connected to it. There were also other sockets in the kitchen on another circuit.
This was done in a junction box inside the old cooker point box, with the earths connected to the cooker box earth terminal.
This was then plastered and tiled over
(Sorry about the picture quality. I got caught without my camera, and had to use my phone )
Oh, and sorry for the delay, but you'll be glad to know we beat the Kiwis for the 3rd and final week
This week we have an old cooker supply.
It is 2no. 6.0mm² singles fed in steel conduit, relying on the conduit for earth.
The cooker supply is no longer used, and has had most of the kitchen ring circuit connected to it. There were also other sockets in the kitchen on another circuit.
This was done in a junction box inside the old cooker point box, with the earths connected to the cooker box earth terminal.
This was then plastered and tiled over
(Sorry about the picture quality. I got caught without my camera, and had to use my phone )
Oh, and sorry for the delay, but you'll be glad to know we beat the Kiwis for the 3rd and final week