Well its that time again folks, this week we have a CU with a loose screw connecting the neutral bar together.
The load was relativly light as the CU fed a portakabin.
There were 2no. 2kW panel heaters, 3no. 4' fluorescents and 4no. twin sockets.
You can see where the burning has been painted over on the trunking and ceiling
The load was relativly light as the CU fed a portakabin.
There were 2no. 2kW panel heaters, 3no. 4' fluorescents and 4no. twin sockets.
You can see where the burning has been painted over on the trunking and ceiling