hi, hope someone can give me advice re new boiler installation.
pipework from meter to boiler has been run in 22mm copper. meter is sited on the gable of building in a wall box and pipework has been run @ 2m horizontally them 90bend, followed by @ 5m vertically, then into boiler. pipework is exposed and secured using plastic clips.
is this to standard/acceptable or should pipework be covered or alternative pipework to copper used as has been suggested by a mate.
pipework from meter to boiler has been run in 22mm copper. meter is sited on the gable of building in a wall box and pipework has been run @ 2m horizontally them 90bend, followed by @ 5m vertically, then into boiler. pipework is exposed and secured using plastic clips.
is this to standard/acceptable or should pipework be covered or alternative pipework to copper used as has been suggested by a mate.