- Joined
- 2 Mar 2019
- Messages
- 287
- Reaction score
- 3
- Country
Hi.
I plasterboarded bedroom with ensuite 8 months ago.
Didn't get it skimmed right away. The room is heated.
My question is how long can a room be boarded before skimming?
Would there be need for further measures like pva?
Ensuite will be tiled would that require anything additional?
Cheers
I plasterboarded bedroom with ensuite 8 months ago.
Didn't get it skimmed right away. The room is heated.
My question is how long can a room be boarded before skimming?
Would there be need for further measures like pva?
Ensuite will be tiled would that require anything additional?
Cheers
Last edited: