I've got a load of 2.4x1.2m x12.5mm tapered edge boards to redo my bedroom ceiling , the walls are bare of plaster too but will be done at a later stage
I've a few questions before I attempt to start the ceiling
should i leave a gap near the walls or butt right up to them?
what do I do with the taper edge that is against a wall or corner?
do I stagger the boards?
if so should start the next run with the tapered edge against the wall or the cut edge at the wall?
should I leave a gap between boards or put them tight against each other?
I've a few questions before I attempt to start the ceiling
should i leave a gap near the walls or butt right up to them?
what do I do with the taper edge that is against a wall or corner?
do I stagger the boards?
if so should start the next run with the tapered edge against the wall or the cut edge at the wall?
should I leave a gap between boards or put them tight against each other?