I agree totally, I will be more than happy too, or if he'd prefer I will send him a cheque for helping me out.
Ian....
Ian....
Note: the Pump gets its Live connection from the Boiler PL terminal via JB 9. This in accordance with mfr instructions.
Switched Live (SL): JB 10
Pump Live (PL): JB 9
No!I'm stuck on these two above, does this mean that I need to link between JB 9 & JB 10 ?Note: the Pump gets its Live connection from the Boiler PL terminal via JB 9. This in accordance with mfr instructions.
Switched Live (SL): JB 10
Pump Live (PL): JB 9
Thank goodness we are anonymous on here.if he'd prefer I will send him a cheque for helping me out.
"If there is no external controls fitted, connect the SWL terminal to permanent live in the JB."
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local