Hi
I am laying 18mm ply over floorboards in a old house but part of the floor has a stone slab and concrete area (where the old chimney used to be).
Just wondering the best way to lay ply over the stone and concrete; I.e any better ways than screwing
into the stone with Rawl plugs
Thanks
DJ
I am laying 18mm ply over floorboards in a old house but part of the floor has a stone slab and concrete area (where the old chimney used to be).
Just wondering the best way to lay ply over the stone and concrete; I.e any better ways than screwing
into the stone with Rawl plugs
Thanks
DJ