pointing perished in dpc brick work

Joined
2 Oct 2004
Messages
224
Reaction score
0
Country
United Kingdom
The mortar in the first layer of bricks of dpc has perished /eroded.

What mix is needed to repoint and method of replacement ?

It is the first layer only at outside ground level.

TIA
 
Sponsored Links
1 part OPC to 3 parts sand. No Fairy Liquid :rolleyes: Rake out 25mm depth and repoint, joint profile to match existing.
 
thoroughly wet the area first. use a brush to wet it as this will remove the dust and wet the area to be pointed at the same time.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top