- Joined
- 2 Oct 2004
- Messages
- 224
- Reaction score
- 0
- Country
The mortar in the first layer of bricks of dpc has perished /eroded.
What mix is needed to repoint and method of replacement ?
It is the first layer only at outside ground level.
TIA
What mix is needed to repoint and method of replacement ?
It is the first layer only at outside ground level.
TIA