The point is, the PCB was working before I called the engineer. There was no issue with it. I called Potterton and they said it’s on OJ’s who caused the issue.
He’s obviously left a leak on the PVR or some leak after he done the work which caused water to leak onto the PCB. Yes he will not give me a penny back but it will not show good light on the long term when I leave a review on google and other review websites.
He’s obviously left a leak on the PVR or some leak after he done the work which caused water to leak onto the PCB. Yes he will not give me a penny back but it will not show good light on the long term when I leave a review on google and other review websites.