Basically we've not heard from our builder in weeks (extension).
A joiner is coming out to fit an oak door frame and door in the opening (pictures).
What do I need to do to get the opening ready?
A joiner is coming out to fit an oak door frame and door in the opening (pictures).
What do I need to do to get the opening ready?
- I assume the opening needs cavity closers on both sides?
- Does dpm go behind the whole frame because it's timber?
- Where does the existing dpm go?
- Guessing I will have to cut the blockwork level with the bricks too?