I've got two plasterboard ceilings I've just put up. One in the lounge, one in kitchen.
Sizes:
Lounge: 4 x 3 metres
Kitchen: 3 x 3 metres
Price for skimming please and can both of them be done in a day ?
I've plastered the whole house myself( bonding and multifinish ) but when it comes to ceilings my hand is giving up after about 30 minutes ! I can probably do the kitchen one but I would presume it won't make such a difference in price for one or two ceilings...
Sizes:
Lounge: 4 x 3 metres
Kitchen: 3 x 3 metres
Price for skimming please and can both of them be done in a day ?
I've plastered the whole house myself( bonding and multifinish ) but when it comes to ceilings my hand is giving up after about 30 minutes ! I can probably do the kitchen one but I would presume it won't make such a difference in price for one or two ceilings...