- Joined
- 30 Oct 2026
- Messages
- 10
- Reaction score
- 1
- Country

We have had a small section of wall newly plastered, and I want to paint it to match the rest of the room, but I do not want to rush it and end up with peeling paint in a few months.
How long do you usually wait before priming new plaster, and how do you tell it is actually dry, rather than just dry on the surface? I have heard different advice on mist coats, from a very watered-down emulsion coat to a dedicated primer, and I am not sure which gives a better result for a normal matt emulsion top coat.
Is one mist coat usually enough, or do you do two thinner coats before the top coats? Any tips for spotting patches that have not taken the paint evenly would be welcome, as the wall is in a room that gets a lot of daylight.
How long do you usually wait before priming new plaster, and how do you tell it is actually dry, rather than just dry on the surface? I have heard different advice on mist coats, from a very watered-down emulsion coat to a dedicated primer, and I am not sure which gives a better result for a normal matt emulsion top coat.
Is one mist coat usually enough, or do you do two thinner coats before the top coats? Any tips for spotting patches that have not taken the paint evenly would be welcome, as the wall is in a room that gets a lot of daylight.