Proposed Wall mounted gas meter cab - hole in external required level?

Joined
30 Mar 2012
Messages
668
Reaction score
4
Location
Monmouthshire
Country
United Kingdom
Am getting my meters moved.

500 thk wall - made up of 100 conc. block, 50 void, 350 breeze.

re the 38mm hole that takes the gas pipe (in a plastic duct) from the proposed wall mounted meter cab to a ground floor bathroom.

Does this hole have to be drilled level? Or can it be drilled to falls, sloping downwards from inside to outside, in order to put the odds against water ingress in my favour? My place is an end of row and that wall gets it biblical in the winter..

I've already drilled it with approx. a 60mm fall over the 500mm wall thickness before remembering that the existing flush cab (set in a conventional thickness 2 leaf and void wall) has a cast/forged steel 90° elbow outlet on top of the meter?

The hot potato warning siren went off over at the Wales & West advice desk when I phoned them, so no answer there..
 
Last edited:
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top