For brick trowells full - about half a 25kg bag of sand +cement.Hi,
I removed 3x bricks for inspection of cavity, which now need re-fitting.
Will someone give me an estimate of how much mortar I'll need to re-fit them please? (I have the lime for the mix)
C
Hi N,For brick trowells full - about half a 25kg bag of sand +cement.
Hi S,Depends how much drops down the cavity.
Hi S,Just a quick tip about replacing a single brick. When you butter the top of the brick and push it in you'll normally find it pushes back out. easiest way to stop this is to smear the bottom of the brick above with mortar which helps keep the mortar on top in place as you push it in.
Hi S,The best way is to damp down the area first. Then lay a bed of mortar and butter the perps in a wedge shape, the same with the top of the hole. Butter the perps of the brick you are putting in with a wedge that goes the opposite way, so they fit together like folding timber wedges would. Do the same with the top. This way you should find the brick goes in without losing too much mortar.
That's the way I've always done it - i.e. prime the recipient bricks with mortar as well as buttering the actual laying brick.Just a quick tip about replacing a single brick. When you butter the top of the brick and push it in you'll normally find it pushes back out. easiest way to stop this is to smear the bottom of the brick above with mortar which helps keep the mortar on top in place as you push it in.
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local